Menu
About Us
Products
Innovation
Careers
Contact
Phone
Building a Better Tomorrow
Many parking lot owners are thrilled to learn that they can cover an old asphalt parking lot with concrete pavement. The many benefits of a concrete parking lot include: increased lighting, safety and reduced annual maintenance cost. A concrete parking lot provides a warm welcome to customers and clients.
I-10 Connect's multi-year project required more than 100,000 tons of asphalt material, as well as aggregates and concrete paving.
GCC pours industrial floors in large format slabs, up to 1,500 m² without a joint control, shrinkage-compensating concrete floor.
GCC’s volumetric truck and Rapid Set® lowered construction costs and had the road ready for use in hours.